WHAT WE OFFER

Projects completed over 11 years, with contract values from 50k until 14M.

Those company contract value include:

{{brizy_dc_image_alt imageSrc=

Demolition

and enovation

{{brizy_dc_image_alt imageSrc=

Schools and

educational

facilities

{{brizy_dc_image_alt imageSrc=

Commercial

buildings, cinemas,

shops, and offices

{{brizy_dc_image_alt imageSrc=

Large-scale

warehousing

{{brizy_dc_image_alt imageSrc=

Civil engineering,

including drainage

systems and roads

{{brizy_dc_image_alt imageSrc=

Hotel

construction

{{brizy_dc_image_alt imageSrc=

PROJECT

Main Contractor: Brightcon Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Danga Bay, Johor


To supply and install Boom Lift and Aluminium Box Lourves Part at

Lot PTB 22902, Danga Bay, Jalan Skudai, Johor.

RM 219,500.00

March 2014

2.

Project : Nusajaya, Johor


To supply and install Cement Board, Aluminium Strip Ceiling and

Fibre Glass for Pejabat Sementara Berserta Ruang Pameran Dua

Tingkat di Sebahagian Lot PTD 178762, Mukim Pulai, Daerah Johor

Bahru, Nusajaya, Johor.

RM 234,963.99

March 2014

3.

Project : Taman Damai, Kota Tinggi, Johor


To supply and install Aluminium Box Lourves of 36 Units of Double

Storey Shop Office Type “C” at PTD 36668 & 36703, Taman Damai

Jaya, Mukim and District of Kota Tinggi, Johor for Daiman

Development Berhad.

RM 73,220.76

April 2014

4.

Project : Taman Molek, Johor


To supply and install Aluminium Strip Ceiling, Lourves and Partition

at Lot 83476, (PTD 115722), Jalan Masai Baru, Mukim Plentong,

Daerah Johor Bahru, Johor for Rest Sdn Bhd (JV with Daiman

Development Berhad) – Taman Molek.

RM 102,053.74

February 2015

Main Contractor: Buildglo Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Persada Bandar - Johor Bahru


Proposed 1 Block of 4 Storey Retail on Lot PTB 24443 at Jalan Trus /

Jalan Salim, Mukim Bandar, Johor Bahru, Johor Darul Takzim.


To supply and install DML Powder Coated Aluminium U-Profile

custom made Façade.

RM 1,139,893.20

March 2019

Main Contractor: Dynaciate Engineering Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Package 27, Rapid Pengerang Johor


To supply and install Partition and Ceiling Works for TecnimontHQC

– EPCC of Camps & TCF.

RM 775,842.39

June 2017

Main Contractor: Dyna Elite Construction Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : PCP Camp, Rapid Pengerang Johor

 

To supply and install Partition Box Up to Colum, Beam and Truss,

PCP Labour Accommodation Camp.

RM 293,760.00

December 2015

2.

Project : TYOM – Camp, Rapid Pengerang Johor

 

To supply and install for Sort of Partition Works, TYOM - Camp

Design and Construction (Phase 2).

RM 418,981.61

January 2016

3.

Project : TOYO – Pengerang Johor

 

To supply and install for Sort of Architecture Work and Partition

Work for SCC Labour Accommodation Camp Security Office,

CDC Buildings, Medical Centre, Maintenance Shop, Mess Hall

and Rondo Metal Stud and Commercial Building.

RM 1,030,725.60

January 2016

4.

Project : PCP Camp, Rapid Pengerang Johor

 

To supply and install Partition Box Up to Colum, Beam and Truss,

PCP Labour Accommodation Camp (Variation Works).

RM 319,788.00

October 2016

5.

Project : Package 22, Rapid Pengerang Johor

 

To supply and Fixing False Ceiling, Plaster Board and Extruded

Polystyrene Insulation Board at PLSB – Building Plant and Non-

Plant (Part B) – Building 511, 512, 513 and 519.

RM 416,121.47

May 2017

6.

Project : Package 7, Rapid Pengerang, Johor

 

To Supply and install Partition and Ceiling Works for ecnimonthHQC-

EPCC of Campas & TCF, Pengerang Johor.

 

RM135,000.00

October 2017

Main Contractor: Dynaciate SPI Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Dynaciate’s New Office 4 ½ Storey DESB Corporate

Office at Pasir Gudang.


Supply and Install 9mm thk Boral Unispan and 9mm Boral Wetstop

and 32mm x 12mm x0.350mm G.I Metalstud Complete Skim Coat.


Supply and Install 100mm thk Bothsides Boral USG Boral Partition

Wall Complete Skim Coat.


Supply and Install 75mm x 40mm and 8mm clear Tempered Glass

Shop Front Glass Panel and 12mm thk Tempered Glass

Complete Accessories.

RM 638, 559.42

February 2020

Main Contractor: Edge Design & Contracts Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : OCBC Bank, Kulai, Johor

 

To supply and install Partition Wall and Suspended Ceiling,

Tempered Glass Panel and Tempered Glass Door for OCBC

Bank, Kulai, Johor.

RM 89,768.40

December 2014

Main Contractor: Famous Design And Renovation Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Sungai Renggit, Pengerang, Johor

 

To supply and install Gypsum Board, Cement Board and Partition

Wall for Building MD1, MD2, SD1, SD2 at Sungai Renggit,

Pengerang, Johor.

RM 178,963.00

February 2016

2.

Project : Giant Plentong, Johor Bahru

 

To supply and install Alumimium Box Lourves, White Aluminium

Metal Gaping, Cement Board and Black Strip Ceiling at Giant

Plentong, Johor Bahru.

RM 290,611.86

July 2016

3.

Project : Hotel Selesa – Ball Room 

 

To Supply and Install Sun Proof Partition Wall and Plaster Ceiling

for main Building works of PTD 19109, Jalan Dato Abdullah Tahir,

Taman Abad, 80300 At Johor Bahru, Johor. 

 

To Supply and Install Acoustics Wall.

RM 580,000.00

May 2018

Main Contractor: Giant Leap Construction Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Worker Quarters for Country Garden, Danga Bay, Johor.

 

To supply, delivery and installation of Temporary Building Ceiling

for the Highest Floor of the Worker Quarters, at Plot 5 Comprising

of 4 Blocks of 3 Storey Worker Quarter Together with Canteen

Block 1 & 2, Shop Lot 1 & 2 and Ancillary Buildings Including

Associated External.


RM 78,126.14

August 2014

2.

Project : Country Garden, Danga Bay, JB

              (Tower Buidling A1, A2, B1, B2, C1, C2)

 

To supply and install Suspended Water Resistant Fibrous Plaster

Board Ceiling including Painting Work for Lift Lobby, Bath &

Maid Bath Room, Car Park.


To supply and install Aluminium Composite Panel for Lift Lobby.

 

RM 1,936,866.91

July 2016

Main Contractor: MEB Construction Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Rapid Pengerang, Johor

 

To supply and install Drywall and Ceiling Works for Rapid

Temporary Executive Village (RTEV), Rapid Temporary

Management Office (RTMO), Facilities for Refinery and

Petrochemical Integrated Development Project (RAPID)

in Pengerang, Johor Darul Takzim.

 

Included Variation Works :

Supply and Install Drywall and Ceiling Works for modular

accommodation Type A, B, D.

 

Package 20

Supply and Install Rondo Metal Stud and Rockwool Ceiling

at RTMO O & M Dining Hall, RTEV Club House (Ground

Floor & 1st Floor).

RM 16,240,901.55


March 2016






October 2016







June 2017



2.

Project : Package 5, Rapid Pengerang, Johor

 

To supply and install drywall system and acoustic ceiling at

substation 4730, Rapid Package 5 TTM L-SSC, Pengerang, Johor.


RM 192,941.12

July 2016

Main Contractor: Modularize Building Technologies Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Rapid Pengerang, Johor

 

To supply box up beam at EPCC of RFCC, LTU and PR units for

rapid project in Pengerang, Johor.

RM 85,860.00

November 2015

2.

Project : Rapid Pengerang, Johor

 

To supply and install Boral Fire Board at worker dormitory at

8 Block, Pengerang, Johor.

RM 81,000.00

March 2016

Main Contractor: Muhhibah Engineering (M) Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Petronas - K.K Sabah 


Proposed Extension of 11 Storey New Office Building Complete

with 2 ½ Floor Sub Basement Car Park For Petronas Carigali Sdn

Bhd on Lot TL. 017503249 at Kota Kinabalu Sabah For Petronas

Carigali Sdn Bhd (“PCSB”)  (“the Project”)  

 

To Supply and Install DML 100-150-200 S/G Prepainted Aluminium

Strip Ceiling.


To Supply and Install 12mm thk Gyproc Topline Gypsum Board with

Seamless Joint Finish and 30mm x 10mm G.I Metal Stud.


To Supply and Install DML 600mm x 600mm x 0.7mm thk

(DML FX Square Clip in Plain Tile Ceiling)

RM 2,188,238.79

August 2019

Main Contractor: Pembinaan Eastern Aluminium Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Flextronics, PTP, Johor 

 

To supply and install Fire Rated Plaster Ceiling, Single Side

Partition, Calcium Silicate, Both Sides Partition Wall and

Suspended Ceiling at Flextronics – PTP, Johor.

RM 467,307.50

February 2015

2.

Project : Pengerang, Johor

 

To supply Labour, Tools and Materials to execute and complete

Demolition of Partition Works at Lot 5025, Mukim Pengerang,

Johor.

 

RM 450,000.00

September 2015

3.

Project : Nusajaya Tech Park Sdn Bhd, Johor Bahru

 

Proposed construction and completion of:

1 Block 2 Storey Administration Office and facilities

1 Block 2 Storey Data Hall and facilities

1 Block 4 Storey Data Hall and facilities

2 Units 2 Storey TNB Substation

1 Unit Bin Center

1 Unit Guard House

On Part PTD 2377, Mukim Pulai, Daerah Johor Bahru, Johor

Darul Takzim for M/S Nusajaya Tech Park Sdn Bhd. 

 

RM 1,600,000.00

September 2016

4.

Project : Ikea, Desa Tebrau, Johor Bahru

 

To supply and install Partition and Ceiling for :

1 Block of 3 Storey Commercial Complex

1 Storey Sub-Basement consist of 2 Storey Commercial Area & Offices

1 Storey Car Park Area on Ground Level

1 Storey Sub-Basement Tunnel on Phase 1

On Part of Lot 102078, Jalan Desa Tebrau, Taman Desa Tebrau,

Mukim Tebrau, Daerah Johor Bahru, Johor Darul Takzim for

M/S Ikano Johor Jaya Sdn Bhd.


RM 4,100,000.00

December 2016

5.

Project : SILC, Iskandar Puteri, Johor

 

To supply and install Partition and Ceiling Works at PTD 182045,

Southern Industrial and Logistic Cluster (SILC), Iskandar Puteri,

Mukim Pulai, Daerah Johor Darul Takzim.

RM 499,867.40

March 2017

6.

Project : JST Connectors (Malaysia) Sdn Bhd, Tanjung Kupang, Johor

 

To supply Aluminium Strip Ceiling and Aluminium Composite

Panel Works at PLOT D02 & D04 (disebahagian LOT PTD 2423)

Jalan A/4, Mukim Tanjung Kupang, Daerah Johor Bahru, Johor

Darul Takzim For M/S JST Connectors (Malaysia) Sdn Bhd – S Plant.

RM 436,069.15

April 2017

7.

Project : Aeon Tebrau, Johor Bahru 

 

To supply and install Plaster Ceiling Works at No.1, Jalan Desa

Tebrau, Taman Desa Tebrau, 81100 Johor Bahru, Johor.

RM 900,000.00

March 2018

8.

Project: Single Storey Data Centre Underground Fuel Storage

Tanks At Sedenak, Johor Malaysia.

 

To Supply and Install Bothside 1 Layer 12.5mm Gypro Baseline

and 1 Layer Bothside 19mm Duraline and 75mm x 32mm x 0.55

THK Gypro Metal Stud and 1 Layer40kg Rockwool & 2 Hour Fire

Rated Drywall Partition.

 

Supply Labour install 600mm x 1200mm Tate Aluminium Ceiling.

RM 1,094,900.00

August 2020

9.

Project: Taman Teknologi 4 

 

To Propose Door, Roller Shutter, Aluminium & Glazing And

Ceiling Works on PTD 951580 (Part of Lot of Origin  85342),

Universiti Teknologi Malaysia, Mukim Kulai, Daerah Kulai,

Johor for M/S Kota Prasarana Sdn. Bhd. 

  

 Sub- Contract Work:

 To supply and Install Ceiling & Partition Works –Factory 1, 2, 3 & 4.

RM 591,806.13

January 2021

Main Contractor: Pembinaan Sahabatjaya Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Plentong, Johor Bahru

 

To supply and install of aluminium works at guard house and

entrance statement works.

Cadangan Pemajuan Bangunan yang mengandungi 3 Blok Pangsapuri

23 Tingkat (792 unit kediaman), 

3 Blok Pangsapuri 3 Tingkat (54 unit kediaman),

5 Tingkat podium tempat letak kereta berserta kemudahan penduduk

3 unit pencawang elektrik (double chamber),

5 unit pencawang elektrik (single chamber),

1 unit pondok pengawal dan

4 unit rumah sampah (central waste handling facility) 

 

Di atas PTD 192018/HS (D) 421925, Jalan Bayu Puteri 2, Taman

Bayu Puteri Mukim Plentong, Daerah Johor Bahru.

RM 134,790.23

May 2015

Main Contractor: PH Marina Boulevard Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Puteri Harbour, Iskandar Puteri, Johor

 

To supply and install Steel Hollow, complete with Plastering,

Skimcoat and Painting bothsides wall at Puteri Harbour,

Iskandar Puteri, Johor.

RM 54,840.57

January 2016

Main Contractor: PLM Interiors Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : MIA @ The Vertical (Bangsar South, KL)

 

To supply and install Wall Partition (Gypsum Board with both

sides guilted with Rockwool Insulation) and Suspended Fibrous

Plaster Ceiling with Armstrong Bioguard Acoustic.

For new headquarters of Malaysia Institute of Accountants (MIA)

at Level 33, 33A, The Vertical, Bangsar South, KL.

RM 280,000.00

March 2016

Main Contractor: PLM Interiors (Johor) Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Dyson Senai, Johor

 

To supply and install Wall Partition and Suspended Ceiling,

Tempered Glass Panel and Tempered Glass Door at Dyson

Senai Phase 1 & 2 Refurbishment.

RM 269,770.65

February 2014

2.

Project : CIMB Bank Training House, Medini Iskandar Nusajaya, JB

 

To supply and install Partition Wall and Suspended Ceiling,

Tempered Glass Panel and Tempered Glass Door at CIMB

Bank Training House, Medini Iskandar Nusajaya, Johor.

RM 215,859.06

January 2015

3.

Project : Dyson Senai, Johor

 

To supply Labour, Tools and Materials to execute and complete

Demolition of Partition Works at Dyson Phase 3, MLT, Senai, Johor.

RM 19,306.14

May 2015

4.

Project : Medini Iskandar Nusajaya, JB

 

To supply and install Partition and Ceiling Works for CIMB Bank

Training House at Medini Iskandar, Nusajaya, Johor Bahru.

RM 391,000.00

March 2016

Main Contractor: Seng Hiap Glass Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : EBP Kempas, Johor Bahru

 

To supply and install Aluminium Strip Ceiling at #156, Cluster,

EBP Kempas, Johor Bahru.

RM 291,720.00

January 2015

Main Contractor: Sinlexon Construction & Decoration Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Golden Screen Cinema, Mentakab Star Mall

 

To supply and install Acoustic Wall and Ceiling Work, Lobby

Corridor Plaster Ceiling and Soundproof Partition Panel at 6

Halls Multiple Cinema of Mentakab Star Mall for Golden

Screen Cinema Sdn Bhd. 

 

RM 122,985.39

June 2012

2.

Project : Golden Screen Cinema Sdn Bhd, Setia City Mall, Selangor

 

To supply and install Acoustic Ceiling, Lobby Corridor Plaster

Ceiling and Soundproof Partition Panel of 9 Halls Multiplex

Cinema at Setia City Mall, Shah Alam, Selangor Darul Ehsan

for Golden Screen Cinema Sdn Bhd.

RM 120,937.18

June 2012

3.

Project : Omega Private School, Senai, Kulai, Johor


To supply and install Partition and Ceiling, Aluminium and Box

Lourvers, Tempered Glass Panel and Tempered Glass Door for

Omega Private School at Lot 6974, Jalan Beringin 5, Mukim

Senai Daerah Johor Darul Takzim.

RM 222,239.39

August 2012

4.

Project : Omega Tuition Center, Taman Century, Johor Bahru

 

To supply and install Partition Wall, Suspended Ceiling, Tempered

Glass Panel and Tempered Glass Door for Omega Tuition Center

at Taman Century, Johor Bahru.

RM 18,032.49

June 2013

5.

Project : Multiplex Cinema, New Central Kuala Lumpur


To supply and install Acoustic Ceiling & Lobby Corridor Plaster

Ceiling and Soundproof Partition Panel for 11 Screens Multiplex

Cinema at New Central Kuala Lumpur for Golden Screen

Cinemas Sdn Bhd.

RM 360,014.10

June 2014

6.

Project : Cineplex, Perling Mall, Johor Bahru


To supply and install Acoustic Ceiling & Lobby Corridor Plaster

Ceiling and Soundproof Partition Panel for 3 Screen Cineplex

located at Ground Floor, Perling Mall, Taman Perling, Johor

Bahru for M/S KPI Cinema Sdn Bhd.

RM 46,699.38

 September 2014

7.

Project : Sales Gallery, Permas Jaya, Johor Bahru 


Proposed One Unit Club House and Sales gallery at Lot 7627,

Bandar Baru Permas Jaya, Mukim Plentong, Johor Bahru, Johor.

RM 12,800.00

November 2014

8.

Project : Taman Desa Tebrau, Johor Bahru


To supply and install Partition Wall and Suspended Ceiling,

Tempered Glass Panel and Tempered Glass Door at Jalan

Harmonium 35/1, Taman Desa Tebrau, Johor Bahru. (Phase 11D)

RM 256,866.77

December 2014

9.

Project : DP Building


Proposed Biocon maintenance Work – DP Building Maintenance

Office Furnishing work.

RM 20,703.00

May 2015

10.

Project : Lotus Five Star Cinema, Taman Costa Mahkota, Melaka

 

To supply and install Acoustic Ceiling & Lobby Corridor Palster

Ceiling and Soundproof Partition Panel of 6 Cineplex at No.1,

Jalan Merdeka, Taman Costa Mahkota, 75000 Melaka for

Lotus Five Star Cinema.

RM 308,000.00

May 2015

11.

Project : Panggung Sri Intan, Klang

 

To supply and install Acoustic Ceiling & Lobby Corridor Plaster

Ceiling and Soundproof Partition Panel of Panggung Sri Intan,

22 Jalan Cox, 41100 Klang.

RM 305,050.00

August 2015

12.

Project : Cinema, Sungai Petani, Kedah

 

To supply and install 2 Hours Fire Rated Board for Cinema

MBO Imago, Central Square (Level 5) 23, Jalan kampung Baru,

Sungai Petani, Kedah. 

RM 1,715,000.00

August 2015

Main Contractor: Sound Acoustic Interior Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : MBO Cinema, Sungai Petani, Kedah

 

To supply and install Suspended Ceiling with Black Matte

Powder Coated Tee Grid 1.200mm by 600mm at MBO Sungai

Petani for MCAT Box Office Sdn Bhd.

RM 75,000.00

September 2015

2.

Project : Pinewood Studio, Nusajaya, Johor Bahru

 

To supply and install Brick Wall and Complete Skim Coat at

Pinewood Studio Foley Room, Nusajaya, Johor Bahru.

RM 50,986.00

September 2015

3.

Project : MBO Cinemas For Aeon Bandar Dato’s Onn Shopping Complex 

 

To supply and install RINT (Rain Impact Noise Treatment System)

for 9 Cinema Halls – 2 Layers 12mm thick Plasterboard and 1

layer 50mm thick rockwool 1 side, come with additional 50mm air

gap sound barrier, with second layer 50mm rockwool 2 layer 12mm

thick Plasterboard at Jalan Dato’s Onn Utama, Johor Bahru, Johor.

RM 540,000.00

September 2017

Main Contractor: Space Alliance Contracts Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Toppen Shopping Mall Tebrau – Johor Bahru

 

To supply and Installation of Ceiling, Partition and Painting of 

 Proposed Johor Bahru Shopping Centre at Jalan Desa Tebrau,

 Taman Desa Tebrau, Johor Bahru for Ikano Johor Jaya Sdn Bhd.

RM 1,561,470.56

March 2019

2.

Project: Affin Bank-KL Package 11A, 11B, 11C

Cadangan Pembangunan 1 Block Pejabat 47 Tingkat Yang

 Mengandungi:

I.    43 Tingkat Pejabat Perdagangan

II. 4 Tingkat Podium Tempat Letak Kereta Berserta 3 Tingkat

Letak Bawah Tanah

Di Atas Lot PT169 (Plot 5 (C7.9))”Tun Razak Exchange’,

Seksyen 67, Jalan Tun Razak, Bandar Kuala Lumpur,

Wilayah Persekutuan Kuala Lumpur untuk Tetuan

Affin Bank Berhad.

 

 

Sub-Contract Work:

 

Supply Labour To Install Aluminium Ceiling at L1 Main Lobby &

Supply & Install Void Bulkhead Cladding (P2-L2) and Auditorium

Partition & Ceiling (L26 – L27).

 

To Supply and Install “ LUXALON’ Aluminium Baffle and Strip

Ceiling.


To Supply and Install Partition, Ceiling & Aluminium Baffle

Ceiling at Level 1, Level 2 and Level 3.

 

To Supply and Install Ceiling & Aluminium Baffle Ceiling at

Level 5 and Level 6.

 

To Supply and Install Partition & Ceiling Work at Level

4, 9, 12, 15, 16, 18, 20, 23, 24, 29, 40 , 41, 42.

 

To Supply and Install TV & Panelling Support to Partition

Wall at Level 2 – 6, 9, 12, 15, 16, 18, 20, 23, 24, 29, 40, 41, 42.

RM 4,264,779.27

January 2021

Main Contractor: Shanghai Baoye Group (Malaysia) Sdn Bhd
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Stadium - Gelang Patah 

Jalan Gelang Patah-Lima Kedai, Mukim Pulai, 81550 Gelang

Patah, Daerah Johor Bahru, Johor Darul Takzim. 

 

To supply and install 9mm thk Hilux Acoustic Calcium Silicate

Board and 100mm thk 40kg Rockwool and 100mm x 32mm x

0.55mm Rondo Metalstud.

RM 1,035,889.40

July 2019

Main Contractor: Zhong Hua Equity Development Berhad
NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Green Land, Johor Bahru 

      

To supply and install Partition Wall for 3 Storey Green Land Sales

Office and 2 Storey Chinese Restaurant at (Green Land) Lot

PTB 23988, Persiaran Abu Bakar Sultan, Bandar Johor Bahru. 

RM 458,088.40

February 2015

2.

Project : Bukit Indah, Johor Bahru

 

To supply and install Partition and Door Panel at #04-25, Wisma

SP Setia, S3-0111, Indah Walk 3, Jalan Indah, Bukit Indah, 81200

Johor Bahru.

RM 50,740.22

September 2015

TRUSTED BY CUSTOMERS

{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=
{{brizy_dc_image_alt imageSrc=